Replacement of plumbing can be done under local or capital repairs. Large-scale events to replace water pipes and sewage must be done about once every 20-25 years. This period shall be based on the performance of pipes. As repair all metal pipes should be replaced by plastic, metal, etc.
When major repairs necessary to dilute the pipeline in accordance with the layout of the premises.
At the same time possible to replace sewer pipes. If there are any hidden sections of the pipeline need to be high quality insulated. You can use the special corrugated PVC pipe. It is used to protect the floor and walls of the possible leakage of water due to thermal expansion of the pipeline. It is also used for mechanical protection of the pipe.
It should be noted that unless absolutely necessary angle heating pipes should not be changed. But when replacing the entire heating system and the like better equipment, consult a specialist. They can also help in choosing plumbing. It is important to find quality material, which will be made of water or sewer pipes. Great demand recently enjoyed plastic pipes. This is due to their fairly low price and long service life. However, they share some characteristics. For instance, placing the connecting nodes in the walls is not reasonable. Tightness of the system could eventually be compromised because the rubber seals may eventually lose its elasticity. Fitting for plastic tubing requires tightening over time.
Still, in some cases without the metal pipe is necessary. In this case it is better to use a tube that is covered with a protective layer of zinc. But weld them hot welding is not necessary. As a result of this procedure, the protective layer may be destroyed. Copper pipes are used in heating systems with a special coolant.
In the production of plastic pipe is mainly used as polyethylene, polypropylene or polyvinyl chloride. Polyethylene pipes have good performance for strength and insulation. The simplicity and low complexity of installation works using plastic pipes connected with their design of rubber seals.
After installation, you can start decorating. Pay attention to the fixation of the socket for the further installation of plumbing. For ease of installation using soft and flexible corrugated pipe connecting hoses. Laying tiles on the floor must be made prior to installation and after the installation of plumbing pipes. After all the finishing work can begin to install plumbing.
Sink attached to the wall with brackets or anchor bolts. Connecting to the water supply by means of a flexible hose. Bath usually just set on the floor. Fix the toilet can use screws that are screwed into the pre-drove the dowels into the holes. If possible, secure the toilet bowl is to the wall. Corrugated pipe is connected to the riser and to the toilet. Transition hose used to supply water to the cistern.
The complexity of all plumbing work is mainly on the initial planning of water supply and sanitation. It can help clear about the correct sequence of operations. In this case, everything will go smoothly, and you will only enjoy the fruits of their own labor.
Thanks for sharing this information.
ОтветитьУдалитьPlumbing Fix
Boiler Repair
Quality is far more important than saving big bucks from your pocket. Remember that plumbing requires high quality materials. Otherwise, problems such as leakage, corrosion, or broken pipes may arise. I prefer using brass/bronze products because they are very durable and resistant to corrosion. Gayle Manning
ОтветитьУдалитьThose are very helpful tips, thanks for sharing it. This will benefit every reader.
ОтветитьУдалитьPlumbing Service Offers